{"id":2437,"date":"2016-10-12T12:04:55","date_gmt":"2016-10-12T12:04:55","guid":{"rendered":"http:\/\/us.rigsderricks.com\/blizzard\/?post_type=portfolio&#038;p=2437"},"modified":"2016-10-12T12:04:55","modified_gmt":"2016-10-12T12:04:55","slug":"tseung-kwan-o-line","status":"publish","type":"portfolio","link":"https:\/\/blitzsteel.com\/project\/tseung-kwan-o-line\/","title":{"rendered":"Tseung Kwan O Line"},"content":{"rendered":"<div class=\"col\">\n<div class=\"text\">\n<h3 class=\"columnMainHeading alternative-heading\" style=\"text-align: justify;\">FULL PROJECT DETAILS<\/h3>\n<div class=\"intro\" style=\"text-align: justify;\">\n<p>A new partnering relationship with MTR Corporation was formed to undertake infrastructure maintenance services for the Tseung Kwan O line, including preventative and corrective maintenance of the track, signalling, overhead line, power supply and trackside auxiliary electrical systems.<\/p>\n<\/div>\n<p style=\"text-align: justify;\">Blitzsteel\u00a0is currently responsible for the ongoing inspection and maintenance services on the 8-stop Purple line, which connects Hong Kong to the new town of Tseung Kwan O (literally, <em>General\u2019s Bay<\/em>) with 15 trains in service during the morning peak at 2.7 minute intervals.<\/p>\n<p style=\"text-align: justify;\">The contracts followed the delivery of the track and overhead line construction for the Tseung Kwan O Extension and the construction of the track, power supply and trackside auxiliaries for the Quarry Bay Congestion Relief Works Project and track infrastructure maintenance in the four MTR Corporation deports.<\/p>\n<\/div>\n<\/div>\n<div class=\"col\">\n<div>\n<div class=\"featuredStory clearfix\">\n<h3 class=\"alternative-heading\" style=\"text-align: justify;\">PROJECT FACTS<\/h3>\n<div class=\"storyBox clearfix\">\n<div id=\"storyTextWrapper\">\n<p style=\"text-align: justify;\">ORIGINAL WORKS COMPLETED UNDER TIME AND BUDGET, LEADING TO A NEW FORM OF LONG-TERM PARTNERING ARRANGEMENT WITH MTR CORPORATION<\/p>\n<p>DETAILED KNOWLEDGE OF THE CONSTRUCTION OF THE TSEUNG KWAN O LINE ENABLES EFFICIENT ONGOING DELIVERY OF KEY MAINTENANCE SERVICES<\/p>\n<p>THE NEW LINE WAS BUILT TO ORIGINALLY TRANSPORT 70,000 PEOPLE PER HOUR, TO NEW RESIDENTIAL AREAS OUTSIDE HONG KONG HOUSING 600,000 ADDITIONAL RESIDENTS<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>FULL PROJECT DETAILS A new partnering relationship with MTR Corporation was formed to undertake infrastructure maintenance services for the Tseung Kwan O line, including preventative and corrective maintenance of the track, signalling, overhead line, power supply and trackside auxiliary electrical systems. Blitzsteel\u00a0is currently responsible for the ongoing inspection and maintenance services on the 8-stop Purple &hellip;<\/p>\n","protected":false},"author":2,"featured_media":2438,"comment_status":"open","ping_status":"closed","template":"","meta":[],"portfolio_category":[45],"portfolio_tag":[],"_links":{"self":[{"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio\/2437"}],"collection":[{"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/comments?post=2437"}],"version-history":[{"count":1,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio\/2437\/revisions"}],"predecessor-version":[{"id":2440,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio\/2437\/revisions\/2440"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/media\/2438"}],"wp:attachment":[{"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/media?parent=2437"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio_category?post=2437"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/blitzsteel.com\/wp-json\/wp\/v2\/portfolio_tag?post=2437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}